top of page

.png)

SOLUTIONS ONLY EXPERIENCE CAN PROVIDE
™
HISTORIC RESTORATION
That time CCS had to put a lid on it
This project was initiated due to a leak at the top of the milk bottle portion of the building. The challenge was in designing, fabricating and installing a giant "cap" for the bottle. Constructed of TPO roofing material and a steel exoskeleton, the cap was welded into place to ensure a water tight seal.
Capital City Services is up to the challenge in addressing any specialized projects!
![]() Project Site | ![]() | ![]() |
|---|---|---|
![]() | ![]() | ![]() |
![]() | ![]() | ![]() |
![]() | ![]() Cap delivered onsite | ![]() Bottle Cap |
![]() Crane in Position | ![]() Raising Cap | ![]() Positioning Cap |
![]() 40' High | ![]() Stainless Steel BandA band was fastened to the structure for the cap to be welded to. | ![]() |
![]() | ![]() Installation Complete |
bottom of page