top of page

THINGS HAPPEN...

...but the job still needed to be completed

During what was to be a routine procedure of removing a failed pipe liner, the CCS robot water blaster got hung up in the material that it was sent to cut out.

With excavation being too time-consuming and costly, CCS called on the aid of professional divers to recover the robot and complete the task of removing the failed liner.​

The pipe was 21" RCP at a depth of 12' and 16' up the line. With safety being the number one concern, a CCTV camera was sent in to observe the divers as they worked.

This is just another instance of CCS finding solutions to get the job done safely and efficiently, regardless of the situation.